- Home
- Mandatory Third Party Conformity Assessment
- PSE Mandatory Third-Party Conformity Assessment
The Electrical Appliance and Material Safety Law applies to enterprises that manufacture or import products in Japan. Please refer to this pampblet of "Comprehensive Guide to Export Electrical Appliances and Materials to Japan". I-2 Domestic enterprises that seek to manufacture or import designated Specified Electrical Appliance![]()
are subject to conformity testing conducted by conformity assessment body and receive a certificate of conformity from the body.
I-3 Confirmation of conformity with the technical standards. I-4 Inspection of the manufacturing process from receiving to completed product and maintenance of records. I-5 Labeling showing a
, the name of an importer, the name of conformity assessment body and other related information legally required. However, since it is essentially impossible to perform the inspections of the manufacturing processes as specified in I-2 and I-3 in the case of domestic importers, this obligation can be fulfilled by having overseas manufacturing factories undergo inspections equivalent to the conformity assessments (under Article 13(2) of the enforcement regulations of the Law) to acquire a certificate of conformity and having the domestic importer obtain and retain a duplicate copy of the certificate. Specifically, this means testing of the products and confirmation of the testing facilities of the factory where the products are manufactured (refer to the flow chart).
In order to fulfill the obligations of I-2 and I-3, the domestic importer must retain copies of the records maintained by the overseas manufacturing factory.
The table below lists the documents and test products required when applying to JET. Please submit one copy of each required document.
| Document | Comments | |
|---|---|---|
| I. | Application for Conformity Assessment |
(Form 4) (Notice for filling in an Application Form) |
| Attached sheet | ||
| Attached sheet 1 Type Classification |
Product category listed in Table 2 to the Enforcement Regulations (as an example, a DC power supply designation is attached as an example). |
|
| Attached sheet 2 The Outline of Products for testing : Structure, Material and Performance |
Provide sufficient detail to allow a determination of the "factors of type classification and classification" including the construction, materials of the main components, performance (electrical rating)and so on, and indicate the product or model name. An explanation for a DC power supply unit is attached as an example. |
|
| Accompanying Documents | ||
| (1) | Annex of Application Form |
PSE-RE-401 : Annex to Application Form(Form 4) PSE-RE-402 : List of Factory(s) PSE-RE-403: Information for Interaction PSE-RE-405 : Conditions for Application for Conformity Assessment |
| (2) | Marking description, on the appliance, tag or package |
|
| (3) | List of Inspection Facilities | Indicate equipment in the manufacturing factory indicated at every classification of electrical appliance in the testing facility in Table 4 to the Enforcement Regulations for each electrical appliance. Indications for a DC power supply unit are attached as an example. Contents of Requirements For reference_Frequency of Inspection English For reference_Frequency of Inspection Chinese |
| (4) | Questionnaire for the preparation of the specified inspection facilities |
|
| (5) | Technical information | Enclosure materials, components installed in the appliance and documentation necessary for conducting tests such as circuit diagrams (drawings, photographs, list of components, circuit diagrams, etc.). |
| Attach if necessary | ||
| POWER of ATTORNEY |
Necessary if a party other than the manufacturer of the product submits the application. | |
| Application for Testing at Manufacturer's premises | Necessary when testing at manufacturer's premises is requested. | |
| CB Certificate | Necessary when the utilization of test data under the CB scheme is requested. | |
| Application for Duplication of Statement of Conformity Assessment |
||
| Application for a supplement (change) to the Statement of Conformity Assessment |
||
Note: When it is possible to confirm the testing facilities based only on the documents, please prepare documentation that confirms ownership of the facilities including a photograph of the facilities, a copy of a facility list, and copies of calibration records.
Contact the following for further information
| Tokyo Laboratory | ||
|---|---|---|
| TEL:+81-3-3466-5234 | FAX:+81-3-3466-9219 | E-mail:tokyo@jet.or.jp |
| Yokohama Laboratory | ||
| TEL:+81-45-582-2151 | FAX:+81-45-582-2671 | E-mail:yokohama@jet.or.jp |
| Kansai Laboratory | ||
| TEL:+81-78-771-5135 | FAX:+81-78-771-5136 | E-mail:kansai@jet.or.jp |
Last Update:2015.05.07

